RYXAVO
Solutions
B2B · Logistics & rental

4G Compact Asset Tracker

IP68 magnetic-mount tracker with temp, humidity, vibration, and tamper sensors.

MAGNETIC · BOLTRYXAVOAT-200 · Cat.1 bis3-YEAR BATTERY92 mmFIG-04 · IP68 · IK08 · Saft LSH20
Battery life
Up to 3 years
Update interval
5 min – 24 h
IP rating
IP68 / IK08
Target BOM
$32–$45
01 / Where it ships

Bolt-on or magnetic; 3-year battery on schedule mode; tamper alert + door reed.

01

Construction tools & rental fleets

Track high-value tools across job sites; auto-alert on jobsite exit.

02

Reefer container monitoring

Temperature + humidity + door + GPS — single sealed device.

03

Trailer & generator security

Vibration wakes the device; tamper alert + last-known location sent.

02 / System architecture

Sensors, MCU, and connectivity — co-designed end-to-end.

Architecture · block diagramReference
SENSORSMCU / SoCCONNECTIVITYBMI270 vibration / tamperSHTC3 temp + humidityReed door sensorMulti-GNSS + A-GNSSSTM32L051Ultra-low-powerQuectel EG915Q Cat.1 bisBLE 5.2 commissioningLSH20 LiSOCl₂ + super-cap
BLOCK-307RYXAVO · REV-A
03 / Key selections

Production-grade parts. Not a generic reference board.

AreaRecommended
CellularQuectel EG915Q-EU / NA
MCUSTM32L051
BatterySaft LSH20 + super-capacitor
EnclosureABS + TPE, ribbed for IK08
04 / Specifications

Detailed specifications.

Cellular
Cat.1 bis with PSM / eDRX
Battery
Saft LSH20 (D-cell, 13 Ah)
Lifetime
Up to 3 years @ 1 report / 12 h
Sensors
IMU, temp, humidity, reed, optional probe
Operating temp
-30°C to +70°C
IP rating
IP68 1m / 72 h
Dimensions
92 × 56 × 28 mm
Mount
Magnetic base or M5 bolt
05 / Customization

Fork the design. We tailor it.

Anything below can be configured per program. Tell us what changes and we'll come back with a delta BOM and timeline.

  • External probe input (NTC / 4–20 mA)
  • ATEX zone 2 certified variant
  • Tilt/orientation alert profile
  • Customer SaaS / MQTT broker integration
  • Wake-on-motion tuning
  • Cellular SIM bundling (1NCE / Soracom / private MNO)
06 / MOQ & lead time

Production terms.

MOQ
1,000 units
Sample lead time
10 working days
Mass production
30 days from PO
Payment terms
30% T/T deposit, 70% before shipment
07 / Certifications

Compliance scope.

  • CE
  • FCC
  • RED 3.3
  • RoHS
  • REACH
  • ATEX-ready option
  • PTCRB / GCF
  • IP68 / IK08
Next step

Get a tailored proposal.

BOM range and feasibility memo within 24 hours.

Request quote